Travel Alert: 4th Ave S Road Repair

Crews repair 4th Ave S pavement buckle

 

Crews will perform an interim repair at 4th Ave S near S Industrial Way on Friday, June 14 and Saturday, June 15. The interim repair will entail removing the steel plates placed during the emergency repair and constructing a full-depth asphalt patch in the damaged pavement area. The interim repair will provide a smooth pavement surface and allow crews time to prepare for the permanent concrete repair.

 

Here’s what you can expect:

 

4thAveS_Pavement

 

SCHEDULE

On Friday, June 14 and Saturday, June 15, crews will be repairing the pavement in asphalt. Work is being done over two separate days to avoid rush hour and to minimize lane reductions. Crews will complete a full concrete repair within 4-6 weeks.

Crews will perform work between 8 AM and 5 PM.

 

CLOSURE | DETOUR

Please travel carefully through the area. Speeds have been reduced to 10 MPH. There is still a noticeable bump. Drivers should…

Original published: 2019-06-14 16:47:51 Read the full Seattle News here


Some local news is curated - Original might have been posted at a different date/ time! Click the source link for details.

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.